New cracks found along tracks, No train services from JE to BV on 30 Sept
#1

https://www.channelnewsasia.com/singapor...ta-4642326
[+] 1 user Likes theold's post
Reply
#2

Expected...never check properly..
[+] 1 user Likes Sharexchange's post
Reply
#3

Where is the CEO of SMRT?
[+] 1 user Likes forum456's post
Reply
#4

And they still want to raise train fares? Rolleyes

Wherever you go, no matter what the weather, always bring your own sunshine Big Grin
[+] 1 user Likes p1acebo's post
Reply
#5

Sure got many more cracks in other places.    Confused

 Thinking is difficult, that's why most people judge
                    Carl Jung
[+] 2 users Like Huliwang's post
Reply
#6

Be prepared for more disruption when more cracked faults are later found in other lines
[+] 1 user Likes talky's post
Reply
#7

The SMRT CEO should lick my crack instead Big Grin

Wherever you go, no matter what the weather, always bring your own sunshine Big Grin
[+] 1 user Likes p1acebo's post
Reply
#8

Till now the smrt CEO is fully shielded by ministers? Powerful...
[+] 1 user Likes Sticw's post
Reply
#9

(29-09-2024, 07:08 PM)Sticw Wrote:  Till now the smrt CEO is fully shielded by ministers? Powerful...

SMRT defnitely need to import FTs whether ang mo or Japs to run the infrastructure.   Sinpwn plan on building Nuclear energy projects and HSR next stop.
[+] 2 users Like luncheonmeat's post
Reply
#10

(29-09-2024, 05:16 PM)Huliwang Wrote:  Sure got many more cracks in other places.    Confused


That is why they refuse to check and rather under- maintain.
Reply
#11

New cracks? That means while repairing, they were careless and created new cracks.

WTF
Reply
#12

(29-09-2024, 07:21 PM)luncheonmeat Wrote:  SMRT defnitely need to import FTs whether ang mo or Japs to run the infrastructure.   Sinpwn plan on building Nuclear energy projects and HSR next stop.

Are your beloved Angmo and Japs better than Chinese in building, maintaining and running infrastructure?   Thinking
Reply
#13

the tracks also know whats
infestation
overpopulation
overstraining
overloading
and now these tracks are unhappy super pissedoff and got stressedout and they finally broken down

its a sign

do not load far too many one can take

too bad saf scholars gonna stress them further

next

might happen in a tunnel real soon....
Reply
#14

Obviously they are under-maintaining the rail system for too long.
Reply
#15

They thought metal will never break...

Confused
Reply
#16

(29-09-2024, 05:16 PM)Huliwang Wrote:  Sure got many more cracks in other places.    Confused

Yes you are very right...Good that is found out early☺️ this now back to nomal. Big Grin

Good that is found out early☺️
Reply


Forum Jump:


Users browsing this thread: 1 Guest(s)