27-09-2024, 09:48 AM
More than 300 engineers and technicians have been working to repair the damage to tracks and equipment on the East-West Line, says Transport Minister Chee Hong Tat.
“As the damage is very extensive, they have to do this carefully and it requires a lot of time,” says Mr Chee: https://cna.asia/4gIVpOc
“As the damage is very extensive, they have to do this carefully and it requires a lot of time,” says Mr Chee: https://cna.asia/4gIVpOc