SG Talk
France’s Nuclear Shutdown Hits 50% of Reactors, Squeezing Supply - Printable Version

+- SG Talk (https://sgtalk.net)
+-- Forum: SG Talk (https://sgtalk.net/Forum-SG-Talk)
+--- Forum: Market Talk (https://sgtalk.net/Forum-Market-Talk)
+--- Thread: France’s Nuclear Shutdown Hits 50% of Reactors, Squeezing Supply (/Thread-France%E2%80%99s-Nuclear-Shutdown-Hits-50-of-Reactors-Squeezing-Supply)



France’s Nuclear Shutdown Hits 50% of Reactors, Squeezing Supply - theold - 30-04-2022

Twenty-eight reactors are offline as Electricite de France SA struggles with extended outages after corrosion issues were found at some sites, requiring lengthy checks and repairs. 

The extra works come on top of already scheduled halts for refueling and regular maintenance, and has brought French nuclear output to the lowest in more than decade for the time of year.

https://finance.yahoo.com/news/half-french-nuclear-fleet-shut-135349724.html


RE: France’s Nuclear Shutdown Hits 50% of Reactors, Squeezing Supply - Rubitin - 30-04-2022

(30-04-2022, 06:12 PM)theold Wrote:  Twenty-eight reactors are offline as Electricite de France SA struggles with extended outages after corrosion issues were found at some sites, requiring lengthy checks and repairs. 

The extra works come on top of already scheduled halts for refueling and regular maintenance, and has brought French nuclear output to the lowest in more than decade for the time of year.

https://finance.yahoo.com/news/half-french-nuclear-fleet-shut-135349724.html

No planning ,engineers now looking at each other. Big Grin