Prime Minister Srettha's government decided in February 2024 to proceed with the 1 trillion baht (S$37 billion) project in Ranong, southern Thailand, after a government-backed feasibility study.
Srettha's vision for a "land bridge" is different from previous attempts to dig a canal through the isthmus of Kra in Southern Thailand.
This project involves constructing two new deep-sea ports on the eastern and western coasts of the isthmus, as well as highway and railway systems connecting the ports, resulting in a connection over land, reported The Bangkok Post.
It is expected to be completed by 2039, with the first phase likely to finish in 2030."
https://mothership.sg/2024/04/kra-land-b...0in%202030.
Posts: 9,466
   
Threads: 34
    
Likes Received: 2,981 in 2,579 posts
Likes Given: 542
day dreaming and money making for many.
Posts: 1,428
   
Threads: 0
    
Likes Received: 375 in 312 posts
Likes Given: 22
Need to unload and reload? Just a legal way to siphon money for the present government
Posts: 9,466
   
Threads: 34
    
Likes Received: 2,981 in 2,579 posts
Likes Given: 542
(05-05-2024, 08:45 AM)mikotan Wrote: Need to unload and reload? Just a legal way to siphon money for the present government
in many corrupted countries, "project" means money making for the officers.
Posts: 5,025
   
Threads: 109
    
Likes Received: 952 in 837 posts
Likes Given: 14
(05-05-2024, 04:09 AM)Scythian Wrote: Prime Minister Srettha's government decided in February 2024 to proceed with the 1 trillion baht (S$37 billion) project in Ranong, southern Thailand, after a government-backed feasibility study.
Srettha's vision for a "land bridge" is different from previous attempts to dig a canal through the isthmus of Kra in Southern Thailand.
This project involves constructing two new deep-sea ports on the eastern and western coasts of the isthmus, as well as highway and railway systems connecting the ports, resulting in a connection over land, reported The Bangkok Post.
It is expected to be completed by 2039, with the first phase likely to finish in 2030."
https://mothership.sg/2024/04/kra-land-b...0in%202030.
................................
Posts: 17,911
   
Threads: 2,389
    
Likes Received: 3,133 in 2,647 posts
Likes Given: 2,109
(05-05-2024, 09:08 AM)Napoleon Porlumpar Wrote: ................................
Despite saving 5 days, Singapore will still be the sole beneficiary of those ocean containers not wanting to use Kra land bridge for reasons being still prefer Singapore MPA PSA excellent friendly, timely and efficient services
Posts: 17,911
   
Threads: 2,389
    
Likes Received: 3,133 in 2,647 posts
Likes Given: 2,109
(05-05-2024, 08:45 AM)mikotan Wrote: Need to unload and reload? Just a legal way to siphon money for the present government
Just like carwash biz in Brazil