Surface to air missile against MQ
14-11-2023, 08:38 PM
I heard from my Israeli friend that Israel has it long ago. He said controlling the loitering missile is like playing computer game, using a joystick, and you do it at the comfort of an office which is far far away from the missile.
Ignore List: Oyk
14-11-2023, 09:00 PM
"358" is equipped with an infrared homing head and an autopilot. The latter has navigation aids that give it special abilities.
As reported, the missile is capable of immediately after the launch to capture the target and aim at it. The mode of loitering ammunition is also provided.
In this case, the product rises to a certain height and begins to describe the eight, searching for the target. When it is detected, capture and subsequent defeat are carried out. The duration of such a flight can reach 15 minutes.
The product carries a high-explosive fragmentation warhead weighing at least 10 kg.
A fuse with non-contact detonation is provided. 16 laser target sensors are used.
https://en.topwar.ru/204737-zenitnaja-ra...e-358.html
As reported, the missile is capable of immediately after the launch to capture the target and aim at it. The mode of loitering ammunition is also provided.
In this case, the product rises to a certain height and begins to describe the eight, searching for the target. When it is detected, capture and subsequent defeat are carried out. The duration of such a flight can reach 15 minutes.
The product carries a high-explosive fragmentation warhead weighing at least 10 kg.
A fuse with non-contact detonation is provided. 16 laser target sensors are used.
https://en.topwar.ru/204737-zenitnaja-ra...e-358.html
« Next Oldest | Next Newest »
Users browsing this thread: 1 Guest(s)