21-06-2024, 12:16 PM
A railway officer said that the trial run of MEMU train (Mainline Electric Multiple Unit) on the newly constructed electrified line section (Reasi-Sangaldan) of the USBRL project, spanning 46 km, was successfully conducted on Thursday at a speed of 40 kmph.
The stations Reasi, Bakkal, Dugga, and Sawlakote are situated in the Reasi district of J&K. The Railway Electrification work on this section has been executed with state-of-the-art technology, ROCS (Rigid Overhead Conductor System), at 25 kV, marking a first on the Indian Railways, the official added.
https://www.thestar.com.my/aseanplus/ase...nd-kashmir
The stations Reasi, Bakkal, Dugga, and Sawlakote are situated in the Reasi district of J&K. The Railway Electrification work on this section has been executed with state-of-the-art technology, ROCS (Rigid Overhead Conductor System), at 25 kV, marking a first on the Indian Railways, the official added.
https://www.thestar.com.my/aseanplus/ase...nd-kashmir