Bukit Panjang LRT upgrade delayed by 2 years to 2026: Iswaran
#1

https://www.straitstimes.com/singapore/t...26-iswaran
Reply
#2

LRT is like bringing the slow electric trash bin truck up to the tracks, nothing innovative.
[Image: Screen-Shot-2015-03-17-at-6-29-15-pm-409x234.png]

Confused
Reply
#3

The Fake Circle Line don't know when can be Real Circle line, too.

Why do we need 5 Mayors and 80 PAP Ministers? 
Reply
#4

should stop wasting money and time on this dino.
Reply
#5

Looks like no contracters want to take up this stupid LRT job because the technology is too old to upgrade. Better to tear it down forever.
Reply
#6

(29-11-2022, 09:30 AM)mrclubbie Wrote:  https://www.straitstimes.com/singapore/t...26-iswaran

they will announce the upgrade during the next GE.

kungong and naive sinkies will buy it and vote them again.
Reply
#7

(29-11-2022, 09:36 AM)ODA TETSURO Wrote:  LRT is like bringing the slow electric trash bin truck up to the tracks, nothing innovative.
[Image: Screen-Shot-2015-03-17-at-6-29-15-pm-409x234.png]

Old tech that still relies on a power rail. China has already been running longer trackless electric-trams that do rapid charging at terminal ends.

Sichuan 2019 Trackless Tram:


Quote:In 2016, SMRT and LTA announced plans to completely overhaul the line as the system approached its designated lifespan of 20 years, with the other factor being the aging CX-100 train cars which was only being used in two transit systems by then, the other being Miami MetroMover.[20] On 8 March 2017, it was announced that the system's power supply, signalling, rolling stock, track, stations, new signalling system and upgrading would be upgraded...

On 7 March 2018, the Land Transport Authority awarded the contract to Bombardier Transportation for $344 million on upgrading the system. This includes replacing the line's signalling system with the new Communications-Based Train Control system for a tighter headway between each trains and thus, reducing waiting time. 19 first-generation trains will be replaced while 13 second-generation trains will be refurbished.[25] The upgrade is slated to be completed by 2024.[26]
https://en.wikipedia.org/wiki/Bukit_Panjang_LRT_line
[+] 1 user Likes sgxin's post
Reply
#8

No more carrot left. Rotfl

“Be who you are and say what you feel, because those who mind don't matter and those who matter don't mind"
Reply


Forum Jump:


Users browsing this thread: 1 Guest(s)